Roll over image to zoom
SKU: 99752271
Grundfos Hydro Multi-E 3 x CRNE 10-2 Single Phase 3 x 0.75kW Variable Speed Booster Pump Set with 24L Tank
Australia-Wide
(08) 9240 2992
Official Grundfos
Peace of Mind
Product Overview
Commercial dry-cleaning and garment finishing hubs maintain process water with the Hydro Multi-E 3 CRNE 10-2. Operating three CRNE 10-2 pumps in parallel duty, the booster automatically cuts pumps in and out to track line velocity. Ordering part number 99752271 puts the fully tested booster skid directly onto the plant room floor.
Discharge rates scale up to 905 L/min to satisfy simultaneous showers. Up to 29 metres of delivery head is available to keep upper-floor fixtures pressurised. Advanced Multi-Master firmware shares operating duties directly between pump heads, providing immediate fail-safe handover if an individual drive is isolated.
Pre-assembled on a vibration-isolated steel base, the booster combines stainless steel pipework, two 80 mm manifold connections, isolation and non-return valves, pressure sensors, plus a 24L diaphragm tank. It connects to a 1 x 200-240 V supply at 50 / 60 Hz with combined rated current of 13.5 A (3 x 4.5 A per pump). Motors carry IP55 sealing with maximum pressure of 10 bar. Liquid-temperature suitability is 5°C to 60°C, and inlet pressure is rated to 10 bar.
Designed for institutional and commercial duty across food production facilities, logistics distribution hubs and aquatic sports centres, the system ensures long service life. Variable-speed motor modulation makes the set a practical clean-water pressure-boosting solution for both new plant rooms and system upgrades.
FEATURES
- The system protects its pumps against dry running if the incoming supply is lost.
- Stainless steel manifolds provide two 80 mm manifold connections ready for plant pipework.
- Frequency converters on the motors pair with IE5 permanent magnet motors for efficient part-load operation.
- Both constant-pressure and proportional-pressure modes are available, so plant rooms can tune response to pipework.
- Pump staging follows demand automatically: pumps enter at low speed as pressure drops, ramp to equal speed, and exit as flow fades.
- Slow-speed duty and staged switching keep consumption down through low-demand hours.
- Multi-Master redundancy means either pump can act as controller, with seamless changeover on fault.
- Integrated Grundfos GO compatibility supports configuration, logging and diagnostics from a smartphone.
- An integrated 24L diaphragm tank carries small draw-offs and limits pump cycling.
- Factory assembled and wet-tested, the set arrives pre-configured for straightforward installation.
- Three Grundfos CRNE 10-2 pumps share the boosting work in parallel.
- Maximum operating pressure of 10 bar with motors sealed to IP55.
- Rated 0.75 kW (P2) on every main pump in the frame.
What's Included
- 3 x Grundfos CRNE 10-2 vertical multistage pumps
- IE5 permanent magnet motors with integrated frequency converters
- Stainless steel suction manifold
- Stainless steel discharge manifold
- Non-return valves
- Isolation valves
- Pressure sensors/transmitters
- Pressure gauge
- 24L diaphragm pressure tank
- Factory assembled and tested booster system
SPECIFICATIONS
| Max Flow | 905 L/Min |
| Max Head | 29 m |
| Power | 3 x 0.75 kW / 240v |
| Rated Current | 3 x 4.5 Amps |
| Suitable For | Commercial Water Supply, Process and Food-Grade Duties |
| Body Material | Stainless Steel |
| Liquid Temperature | 5°C to 60°C |
| Inlet Size | 80 mm |
| Outlet Size | 80 mm |
| Warranty | 24 Months |
Warranty & Returns
All products supplied by Foundation Pumps are covered by a minimum 12-month warranty unless otherwise stated. Some brands may offer longer manufacturer warranties. Warranty covers manufacturing defects, faulty materials and workmanship under normal use.
- Products must be installed correctly and in accordance with the manufacturer’s instructions.
- Warranty does not cover incorrect installation, misuse, dry running, normal wear and tear, unauthorised repairs or damage caused by external factors.
- Proof of purchase, photos, videos and installation details may be requested when assessing a warranty claim.
- The customer is responsible for returning the product to Foundation Pumps or the nominated service centre unless otherwise agreed.
- Removal, reinstallation, labour and associated site costs are generally the customer’s responsibility unless required under Australian Consumer Law.
- Change-of-mind returns may be accepted within 30 days provided the product is unused, uninstalled and returned in its original packaging.
- Customers are responsible for return freight costs for change-of-mind returns.
- Restocking fees may apply to special-order, bulky or non-stocked products.
- Used, installed or specially ordered products may not be eligible for change-of-mind returns.
- If a product arrives damaged or faulty, please contact Foundation Pumps as soon as possible so we can assist with the appropriate repair, replacement or refund.
Your rights under Australian Consumer Law are not affected.
How does the integrated variable frequency drive regulate motor speed across changing flow rates?
Speed-controlled electric drive on the Grundfos Hydro Multi-E 3 CRNE 10-2 U8 A-A-I-I-DU (part number 99752271) delivers power through three IE5 permanent-magnet MGE electric motors rated at 0.75 kW each on 1 x 200-240 V mains.
Under full operational pressure, what dynamic head does this parallel booster assembly deliver?
Pressure boosting performance allows the Hydro Multi-E 3 CRNE 10-2 to achieve up to 29 m dynamic elevation head and an 10 bar working envelope.
Which pipework connection sizing and manifold valves are integrated across this booster unit?
Common manifolding across the Hydro-Multi-E-3-CRNE-10-2 utilizes DN 80 stainless steel suction and discharge pipework with integrated non-return valves and isolating ball valves.
What warranty coverage and service provisions back this multi-pump booster unit?
Warranty support for the Hydro Multi E 3 CRNE 10 2 is delivered through an authentic Grundfos two-year manufacturer warranty covering the complete factory-assembled booster skid.
Which maximum flow rate does this variable speed booster assembly deliver into pressurised mains?
Peak water displacement for the 3 CRNE 10-2 (Hydro Multi-E) reaches up to 905 L/min to satisfy elevated site requirements.
Need help choosing the right pump?
Our team of pump experts are here to help you find the perfect solution for your application.
- Free expert advice
- Pump sizing & system recommendations
- Fast response — call or email us










