Roll over image to zoom
SKU: EML603NNHH10000
SEKO Tekba EML 603 PVDF EPDM Solenoid Dosing Pump
Australia-Wide
(08) 9240 2992
Official SEKO
Peace of Mind
Product Overview
Metal finishing workshops deploy controlled acid pickling chemistry to strip mill scale from structural components before zinc electroplating. Inert fluoropolymer head materials resist rapid degradation from heated hydrochloric acid solutions used across cleaning baths. Workshop technicians set chemical dosing rates via rear push-button controls to maintain active bath concentrations throughout long production shifts.
Electromagnetic positive displacement delivers stepped chemical injection across calibrated pressure tiers: 4.0 L/h (0.07 L/Min) at 12 bar, 5.0 L/h (0.08 L/Min) at 10 bar, 6.0 L/h (0.1 L/Min) at 8 bar, and up to 8.0 L/h (0.13 L/Min) at 2 bar, with a stroke capacity of 0.42–0.83 cc/stroke. The wetted liquid end incorporates a chemical-resistant PVDF pump head with manual priming valve, double ceramic check valve balls, a solid PTFE diaphragm, and EPDM seals, with a dry net weight of 3.4 kg (SEKO 2026 W&I Catalogue, p. 15). A complete PVDF installation kit is supplied, including a PVDF foot filter, PVDF injection valve, 4 m PVC suction/purge tube, and 2 m PVDF delivery tube for 4/6 mm connections.
Operating from a stabilized 100–240 VAC (50/60 Hz) switch-mode power supply with an energy draw of 17.0–22.0 W, the drive operates up to 160 strokes per minute using 4/6 mm plumbing connections. Constant-flow regulation is configured via the rear-panel digital keyboard and display for stroke frequency setup across operating rates, alongside an external circular connector for a low-chemical level probe.
Built with an IP65 fiberglass-reinforced polypropylene casing, the housing withstands wet plant washdowns and corrosive chemical fumes. Sealed external circular IP65 plugs enable all electrical and signal wiring to be terminated without exposing internal circuitry. Base-mounting slots facilitate fast installation on dosing skids or chemical reservoirs. All units are backed by local Australian inventory and technical spare parts availability.
FEATURES
- Calibrated chemical displacement providing up to 8.0 L/h across tiered pressures up to 12 bar (120 m head)
- Corrosion-proof fluoropolymer liquid end with dual ceramic ball valves for broad acid and alkali compatibility
- Alkali-resistant EPDM wetted O-rings providing seal stability when dosing high-pH chemical fluids
- Solid pure PTFE diaphragm delivering total chemical isolation with no composite layers to delaminate
- Digital microprocessor interface on rear panel allowing direct frequency setup from 0 to 100% without halting operations
- Energy-conserving 100–240 VAC multi-power supply consuming 17.0–22.0 W with stabilized solenoid coil pulsing
- Factory-supplied PVDF accessory kit featuring weighted foot valve, injection quill, 4 m suction/bleed tubing, and 2 m discharge tubing for 4/6 mm ports
- Protective IP65 enclosure guarding internal electronics from corrosive plant atmospheres and low-pressure washdown spray
- Warranty: Backed by official SEKO manufacturer warranty (including 5-year solid PTFE diaphragm guarantee) against manufacturing defects
SPECIFICATIONS
| Max Flow | 0.13 L/Min |
| Max Head | 120 m |
| Power | 0.022 kW / 240v |
| Suitable For | Liquid Caustic Dosing |
| Body Material | PVDF |
| Liquid Temperature | Maximum 40°C |
| Inlet Size | Hose Connection (4/6 mm) |
| Outlet Size | Hose Connection (4/6 mm) |
| Warranty | 24 Months |
Warranty & Returns
All products supplied by Foundation Pumps are covered by a minimum 12-month warranty unless otherwise stated. Some brands may offer longer manufacturer warranties. Warranty covers manufacturing defects, faulty materials and workmanship under normal use.
- Products must be installed correctly and in accordance with the manufacturer’s instructions.
- Warranty does not cover incorrect installation, misuse, dry running, normal wear and tear, unauthorised repairs or damage caused by external factors.
- Proof of purchase, photos, videos and installation details may be requested when assessing a warranty claim.
- The customer is responsible for returning the product to Foundation Pumps or the nominated service centre unless otherwise agreed.
- Removal, reinstallation, labour and associated site costs are generally the customer’s responsibility unless required under Australian Consumer Law.
- Change-of-mind returns may be accepted within 30 days provided the product is unused, uninstalled and returned in its original packaging.
- Customers are responsible for return freight costs for change-of-mind returns.
- Restocking fees may apply to special-order, bulky or non-stocked products.
- Used, installed or specially ordered products may not be eligible for change-of-mind returns.
- If a product arrives damaged or faulty, please contact Foundation Pumps as soon as possible so we can assist with the appropriate repair, replacement or refund.
Your rights under Australian Consumer Law are not affected.
What chemical delivery adjustment controls and signal inputs does this unit offer?
Chemical feed adjustment across SEKO Tekba EML 603 PVDF EPDM Solenoid Dosing Pump provides constant-flow regulation configured via a rear-panel digital keyboard and display for stroke frequency setup across operating rates, plus an external circular connector for a low-chemical level probe.
Which manufacturer warranty parameters and diaphragm coverage support this pump?
Equipment protection on EML603NNHH10000 is backed by the official SEKO manufacturer warranty, which includes a 5-year guarantee on the solid PTFE diaphragm under standard sheltered plant installation conditions.
What fluid transfer throughput and delivery pressure are developed by this unit?
At maximum hydraulic throughput, the EML-603-NNHH-10000 delivers stepped chemical dosing across calibrated pressure tiers: 4.0 L/h or 0.07 L/Min at 12 bar, 5.0 L/h or 0.08 L/Min at 10 bar, 6.0 L/h or 0.1 L/Min at 8 bar, and up to 8.0 L/h or 0.13 L/Min at 2 bar, with a stroke capacity of 0.42–0.83 cc/stroke.
Which line voltage supply and electrical wattage demand are needed for this unit?
Operational energy demand across EML 603 NNHH 10000 utilizes a stabilized 100–240 VAC at 50/60 Hz switch-mode connection drawing 17.0–22.0 W at stroke rates up to 160 strokes per minute.
Which wetted component metallurgy and installation hardware are included for this pump?
Fluid path materials across Tekba EML 603 (EML603NNHH10000) feature a chemical-resistant PVDF pump head with manual priming valve, double ceramic check valve balls, a solid PTFE diaphragm, and EPDM seals, and includes a complete PVDF installation kit with PVDF foot filter, PVDF injection valve, 4 m PVC suction/purge tube, and 2 m PVDF delivery tube for 4/6 mm connections.
Need help choosing the right pump?
Our team of pump experts are here to help you find the perfect solution for your application.
- Free expert advice
- Pump sizing & system recommendations
- Fast response — call or email us










